Many
Manuals
search
Categories
Brands
Home
Datalogic
Network switches
Controller SC6000
Installation Manual
Datalogic Controller SC6000 Installation Manual Page 12
Download
Share
Sharing
Add to my manuals
Print
Page
/
78
Table of contents
TROUBLESHOOTING
BOOKMARKS
Rated
.
/ 5. Based on
customer reviews
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
BHS AND REDS INST
ALLATIO
N MANUAL
6
2
2.2
GENERAL SC
A
NNER M
OUN
TING
NOTE
For correct cabl
e positioning and routing see
par. 3.4 and par.
3.8.
2.2.1
Fast Bracket Mount
ing
Figure 4 - Fast Bracket Mounting
1
2
...
7
8
9
10
11
12
13
14
15
16
17
...
77
78
STANDARD
1
REDUNDANT SYSTEMS
1
BHS AIRPORT ARRAYS
1
CONTENTS
3
1 BHS AIRPORT ARRAYS
7
1.5 STANDARD BHS PACKAGES
8
2 MECHANICAL INSTALLATION
10
(2 pcs each)
11
2.2.1 Fast Bracket Mounting
12
2.2.2 Scanner Positioning
13
2.2.3 Scanner Mounting
13
MECHANICAL INSTALLATION
15
(drawing above)
16
3 CONNECTIONS
21
3.3 READER CONNECTIONS
23
3.4 CABLE CONNECTIONS
24
3.5 DIP SWITCH SETTINGS
25
PNP Connection Shown
26
3.8 CABLE ROUTING
28
3.9 GROUNDING
28
4 SOFTWARE CONFIGURATION
29
SOFTWARE CONFIGURATION
31
PS Offset Calibration
34
Resulting PS signal
38
4.6 FINAL CHECKS
40
4.7 COMMISSIONING
40
5.1 MAINTENANCE – LEVEL 1
41
5.1.2 DARP™ Backup
41
5.1.3 DARP™ Restore
41
5.2 MAINTENANCE – LEVEL 2
42
5.3 TROUBLESHOOTING
42
5.7 DL-NET (GENIUS™ ADD-ON)
44
6 REDUNDANT SYSTEMS
45
6.2 MECHANICAL INSTALLATION
47
Small Package Detecting
49
PS Line
50
6.2.4 Encoder Mounting
50
Alternative Encoder Mounting
50
6.3.1 DIP Switch Settings
51
6.3.2 REDS T-Label Station
52
6.3.3 REDS L-Label Station
53
6.5.1 Diagnostic Procedures
56
Configuration
57
Standby-Active Switch Over
58
6.5.2 WebSentinel Interface
59
Host Interface
60
6.5.3 Power Supply
61
6.5.4 Dual Ethernet
61
A INSTALLATION CHECKLIST
64
SUPPLIES
65
ARRIVAL ON SITE
65
ASSEMBLE THE FRAME AND ARRAY
65
MAKE BACKUPS
66
FINAL OPERATIONS
66
B COMMISSIONING CHECKLIST
67
C MAINTENANCE CHECKLIST
68
MAINTENANCE CHECKLIST
69
D ACCEPTANCE TEST PROCEDURE
70
TEST PROCEDURE:
71
RESULTS:
71
SHORT REPORT
72
No
72
E TEST CHARTS
73
Comments to this Manuals
No comments
Publish
Print document
Print page 12
Comments to this Manuals