Datalogic GWY-01-PBS-01 Specifications Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 67
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
GWY-01-DNT-01 MANUAL – REV. 02 CHAPTER 1:
GETTING STARTED
PAGE 14 OF 67
1.6 INSTALLING THE GATEWAY
The GWY-01-DNT-01 supports DeviceNet communications and can be connected to
a LAN and/or Programmable Logic Controller (PLC) via DeviceNet-compatible
cabling.
Follow the Steps Below to Install the Gateway
1. Note the Installation Guidelines in Chapter 1, Section 1.5
.
2. Securely mount the Gateway to your chosen location using two M5 (#10)
screws, lock washers and nuts. The Gateway may be mounted in any
orientation, but should be aligned in such a manner that the LED
indicators can be seen during operation.
3. Attach one end of a 5-pin, male-to-male, M12, ThinNet drop cable (EMS
P/N: CBL- 1481-XX) to the 5-pin, female, M12 connector on the
Gateway. Connect the other end of this 5-pin, male-to-male, M12,
ThinNet drop cable to the 5-pin, female, M12 connector on EITHER a
ThickNet to ThinNet Drop-T Connector OR a ThinNet to ThinNet
Drop-T Connector (as per your network and RFID application
requirements). See figure below for Drop-T connectors.
Figure 1-2: Drop-T Connectors and Terminating Resistors
4. Attach one end of a male-to-female trunk cable to each mating connector
on the Drop-T Connector. Continue connecting trunk cables and Drop-T
connectors as needed. Note: trunk length should not exceed 300m for
ThickNet and 20m for ThinNet.
5. Connect the male end of a 5-pin, male-to-female ThinNet drop cable to
the female end on your Drop-T connector(s). Attach the remaining
female end of the ThinNet drop cable to the 5-pin, male, M12 connector
on a Cobalt HF and/or C-Series Controller (RS485 models).
6. Repeat Step 5 for each RFID controller you plan to install. Note:
maximum drop cable length is 2m.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 66 67

Comments to this Manuals

No comments